Detail :: Data Jembatan
Jembatan Mokpo
Mokpo bridge is planed by purpose to improve
accessibility between physical distribution establishment such as Mokpo
new outer port and Muan international airport and to cope efficiently
Traffic demand between ambit by development of north port and new outer
port. Construction of Mokpo bridge can achieve role of detour road
that take place of line No.1capital in Mokpo, and can plan a part of
port in Mokpo zone.
Main bridge span is decided for ship sailing safety security by 500M
through ship control simulation. Superstructure is designed to cable
stayed bridge with steel composite type suitable to long span. Approach
bridge is designed as composite steel box girder of 80/56M mixed spanary
that harmonized with main span and provided an open view.
Considering depth of water and soil condition, foundation is designed
as various type such as precast caisson, square shape caisson,
case-in-place pile, and spread footing
Project Summary |
• Project : Mokpo Bridge (Koha~Jukkyo)
• Location : Jukkyo-dong, okPo, Cheonnam • Length : Main Bridge : 1,130M • Approach Bridge : 1,940M • Earthwork : 1,160M |
Structure Summary |
• Main Bridge : Cable Stayed Bridge with
Steel Composite (80+210+550+210+80) • Approach Bridge : Steel Box Girder Bridge (2@(5@65+5@65+4@80) • Width : 24.3M • Pylon : Diamond Type Concrete Pylon • Foundation Main Bridge : Precast Caisson Approach Bridge : Precast aisson, Cast-In-Place Pile |
Sumber :
http://www.bnse.co.kr/english/saup/company_view.php?idx=14
Galeri Foto |